Case


Your current location:Home- Case - Medical Technology Industry
Aviation Industry Automotive Industry Mold Manufacturing Industry 3C Consumer Electronics Heat Exchange Industry Medical Technology Industry Equipment & Products Energy Industry

Issues in the Early Development Stage:

◆ Long production cycle and high production costs

◆ To meet the non-toxic requirements of medical devices, only expensive medical-grade beryllium copper can be used, resulting in high mold costs


Solution:

◆ Through the conformal cooling channel solution, mold steel can replace beryllium copper while achieving efficient cooling and shortening the production cycle


Advantages:

◆ Cooling time reduced from 20 seconds to 15 seconds, cooling temperature decreased from 82°C to 54°C

◆ Product deformation rate: reduced by 0.5 millimeters


Syringe mold.jpg

Tel: +86-13045673351 / Email: pzw@ckhh-tech.com / Factory Address: Building 15, No. 3288 Zhongshan Road, Dushangang Town, Pinghu City, Zhejiang Province, China

Copyright © 2025 Shanghai Changkun Hanghe Technology Co., LTD.

Sitemap RSS Disclaimers

Technical Support:Winsharing